News   Installations    2D 
 Statement 
CV 
 Links
 Contact 
                         


Installation I Above, Below, Salt, water, stainless steel, acrylic, hardware, 8'x8'x16' (each brick 1'x1'x1')  
Previous  Next
beilil Liu beilil Liu   Fresh water drips are delivered from the structure above and drip onto the salt bricks below.

Corrosion and crystal growth occur simultaneously throughout time. The materials perform a subtle and gradual change, one that alters the initial arrangement-- sharp lines soften, exact reduces to approximate, ridged form becomes organic form. Traces of the initial configuration remain throughout the duration of the show, inscribing the work with its own history and suggesting ongoing process.
beilil Liu beilil Liu    
beilil Liu    
beilil Liu   Saturated salt water accumulates at the bottom of the bricks
beilil Liu    
beilil Liu   Crystal growth on stainless steel surface
beilil Liu    
beilil Liu    
beilil Liu   Water carving on the side of a brick
beilil Liu   De-installation, bottom of bricks
       
       

 

 

 

 

 

All rights reserved ©